Monday, August 30, 2021

Wires and Garage Concrete!

We saw a spray painted sign late last week: "garage concrete pour on Monday."  I had a 7:00am meeting, but Joe and Rachel headed over to watch some of the action.  Love to have the kiddos be a part of the process and see how things are done.  

The electrical is almost done - wires everywhere!  I am impressed with electricians and all that they have to navigate.  I looked at the box one day and was wondering how on earth it all comes together - so many wires!

Other items: 
  • They added the "faux" window on the upper, left side of the house (it was bothering me without the symmetry) 😏 - but we knew it was on the list to get completed.  
  • They have almost finished with the roof - added the middle, metal section on Friday.

So many wires!








Upper, left window added (faux)

No comments:

Post a Comment